Take an estimating group that used to spend forty hours on a mechanical takeoff. They build a tool, or buy one, and the same takeoff now takes nine. Same scope, same accuracy, same estimator checking the numbers at the end.
If that group bills its client by the hour, it just cut its own invoice by 78%.
The client is happy. The owner of the firm is confused, because the investment that made the team faster made the revenue line smaller. The estimator learns something worse: finishing early costs the company money.
I posted a short version of this question on LinkedIn at the end of August. Is T&M dead in the world of AI?
The short answer is no, and also yes, depending on which hours you are billing. I have spent twenty years on the side of the table that carries the price, across more than $750M of EPC and capital work and the bid systems for an eleven-business portfolio. The pricing model was never a finance decision. It decides who keeps the gain when the work gets cheaper to do, and who eats the loss when the scope moves.
/ SECTION 01What T&M was built to do
Time and materials exists because some scope cannot be priced before you start. Nobody knows what you will find behind the wall, how many spools need rework, or how long the client's engineer will take to answer the RFI. So the parties split the risk. The client carries the quantity: how many hours, how much material. The contractor carries only its rate.
That split is fair when nobody can see the scope. It rests on one assumption: hours measure the work. For most of the history of this industry, they did. More output took more effort, and effort showed up as hours.
AI breaks that link in some of your work and leaves it alone in the rest.
A pipefitter welding a spool takes the same hours this year as last year. A crew pulling cable, setting steel or rebuilding a pump works at the speed of hands and equipment. No model changes that, and T&M for field labour on uncertain scope still makes sense.
Your office is a different story. Estimating, scheduling, drafting, document control, progress reporting, procurement admin, submittal packages: these are the hours that tools are shrinking now. If you bill those hours, you are selling a unit that is getting smaller every quarter.
So split the question. T&M on the tools is alive. T&M on the thinking is on its way out.
/ SECTION 02The efficiency penalty
The efficiency penalty
A firm invests in tools that cut its office hours, keeps billing those services by the hour, and watches revenue fall by exactly the hours it saved. The client keeps the whole gain. Inside the firm, the incentive turns: project managers stop using the tool, or the hours on the timesheet stop matching the hours spent. Either way, the firm paid for the efficiency and taught its people to hide it.
The second outcome is the dangerous one. Once your team learns that faster work looks bad on the invoice, you have a pricing model that rewards padding. No owner sets out to build that. It shows up on its own when the rate card stays the same and the work underneath it changes.
The fix is to stop selling hours for work where hours no longer measure the value.
/ SECTION 03Lump sum is not a free win
The obvious answer is fixed price. Price the takeoff as a deliverable, finish it in nine hours, keep the difference. That works, and for defined office work it is the right move.
Fixed price carries its own risk. You now own the scope. If the scope moves and your change process is weak, you eat the movement. A lump sum on a vague scope is a bet, and the house usually wins: the client, who now has a fixed number and every incentive to read the scope generously.
So the rule has two halves. Price fixed what you can define. Price open what you cannot. And if you price fixed, your change discipline has to work, because every scope gap you miss becomes free work. (Note #07 covers the change orders nobody writes.)
Price fixed what you can define. Price open what you cannot.
/ SECTION 04Five models and where each one fits
Most firms default to the model they have always used. Pick the model by asking who can see the scope and who controls the cost.
Outcome-based pricing gets the most attention right now, and it deserves some. It also fails in a specific way: a firm promises a result that depends on the client's people, the client's data or the client's decisions, and then cannot deliver it. If the client controls half the variables, put a scope boundary in the contract or price something else.
/ SECTION 05Split the job and price each part on its own terms
Most jobs do not need one model. They need three or four, matched to the parts of the work.
Take a plant upgrade with an engineering phase, a defined installation, and a shutdown with unknown conditions behind the equipment.
- Discovery and front-end engineering: fixed fee for a defined set of deliverables. If the client cannot define the deliverables yet, a short T&M discovery phase with a cap, ending in a scope document you can price.
- Defined installation: lump sum, priced from the scope that discovery produced.
- Quantities you can count but not predict: unit rates. Per metre of pipe, per tonne of steel, per weld. The client carries the quantity, you carry the rate, and the rate rewards your productivity.
- True unknowns inside the shutdown: T&M on signed daily tickets, with a clear trigger for when work moves from the lump sum into the T&M bucket.
This structure keeps the efficiency gain where your tools create it, and leaves the risk of the unknown with the party who owns the asset.
/ SECTION 06When you are the one buying
Owner-operators buy as much as they sell. You hire engineers, consultants, software firms and specialty contractors, and most of them still bill by the hour.
Ask one question when a vendor tells you they use AI: who keeps the savings? If they bill hourly and their hours just fell, you should see it on the invoice. If they bill hourly and the invoices look the same as two years ago, ask why.
Better still, ask for fixed fees on defined deliverables. A firm that has built the tools will often say yes, because a fixed fee lets them keep part of the gain. A firm that has not will push back, and that tells you something too.
/ SECTION 07Five questions before you set the price
Run these on the next job you price, before anyone opens the rate card.
- Can I write the scope well enough that a stranger could price it? If not, do not fix the price yet. Fix the price of the work that defines the scope.
- Who controls the variables that drive cost? If the client controls them, they carry the quantity risk. If you control them, you can carry the price.
- How much of the effort is office work that tools are shrinking? That share should move off hourly billing first.
- Can I measure the result the client cares about, and do I control enough of it to promise it? If yes to both, consider pricing the result.
- Does my change process work? If your crews do extra work without writing it up, fixed price will cost you more than T&M ever did.
So is T&M dead? For a crew on the tools facing scope nobody can see, no. Keep it, with signed daily tickets. For the hours your office spends on work that tools now do in a fraction of the time, hourly billing hands your investment to the client. Move that work to fixed fees and unit rates, and keep the gain you paid for.
Northline Works bills on outcomes where we can, so read this with that in mind. The framework holds either way.
The frameworks are free. The work is the offer.